Pre Establishment Services |
SR. NO. |
DEPARTMENT NAME |
DOCUMENT DETAILS |
DOWNLOAD |
1 |
Dept of Cooperation |
Registration of Cooperative Society |
Download |
2 |
Directorate of Fire and Emergency Services |
Provisional N.O.C for Educational and Institutional Places |
Download |
Provisional N.O.C for Factories and Establishments where electrical motor capacity exceeds 5 H.P and above |
Download |
Provisional N.O.C for Godown and Warehouses (High Hazard) |
Download |
Provisional N.O.C for Godown and Warehouses (Low Hazard) |
Download |
Provisional N.O.C for Godown and Warehouses (Moderate Hazard) |
Download |
Provisional N.O.C for Occupation of Building over 15 metres in height from the ground |
Download |
Provisional N.O.C for POL dispensing outlet |
Download |
Provisional N.O.C for Shipyards and Workshops |
Download |
Provisional N.O.C for Tank Farm of Petroleum Products |
Download |
Provisional NOC for Hotel under 3 & 4 starred Category as per National Building Code of India 2005, Part 4 (Fire and Life Safety) |
Download |
Provisional NOC for storage places of flammable and hazardous goods |
Download |
Provisional NOC for Storing andor selling of Fire Works more than 25 kgs. And up to 50 Kgs. under Explosive Act 1984 and Rules 1983 |
Download |
Provisional NOC for Storing andor selling of Fire Works upto 25 kgs. Under Explosive Act 1984 and Rules, 1983 |
Download |
Registration to set up Solar Renewal Energy Power Project |
Download |
3 |
Electricity |
Document Checklist |
Download |
Download |
Download |
Notification EODB Electricity |
Download |
Procedure New Connection-Electricty |
Download |
Timelines-electricity |
Download |
4 |
Excise |
Licence for Establishment of Distillery |
Download |
Download |
Download |
Download |
5 |
Factories & Boilers |
Approval of Factory Plan |
Download |
Download |
Inspection of material for site erected boiler |
Download |
Inspection of material for steam pipeline |
Download |
Registration of Boiler Erector Repairer |
Download |
Registration of Boiler Manufacturer |
Download |
Registration of Boilers |
Download |
6 |
Forest |
Tree Felling |
Download |
Tree Transit |
Download |
7 |
Goa Industrial Development Corporation |
Construction Permit |
Download |
Download |
Download |
Download |
Land Allotment |
Download |
Download |
Download |
Download |
Plinth Level Inspection |
Download |
8 |
Goa Pollution Control Board |
Consent to Establish (Water & Air) |
Download |
Download |
Download |
Download |
Download |
9 |
Public Works Department |
Road Cutting |
Download |
Download |
Sewerage Department |
Download |
Water Connection |
Download |
Download |
Download |
Download |
Download |
10 |
Registration |
Property Registration |
Download |
Download |
11 |
Revenue |
Change in Land Use |
Download |
Download |
Download |
12 |
Town & Country Planning |
Building Plan Approval |
Download |
Issue of Completion Order |
Download |
Issue of Technical Clearance |
Download |
NoC under Section 49 (6) of the TCP Act |
Download |
Permission under 17-A of the TCP Act |
Download |
Zoning Information Certificate |
Download |